Product Details
Main Components
Liquefied acidophilic Rhodopseudomonas palustris
Execution Standards
GB 20287-2006
Quality Standards
- Viable Bacteria Count: 1-10 billion/g
- Formulation: Aqueous Solution
Product Introduction
Photosynthetic bacteria can degrade organic matter in water bodies and also absorb harmful substances like ammonia, nitrite, and hydrogen sulfide. Deploying acidophilic Rhodopseudomonas palustris treats sewage by continuously consuming significant amounts of nitrogen and phosphorus, thereby inhibiting phytoplankton growth. These bacteria are nutritionally valuable and find application in aquaculture feed additives, enhancing production with their disease resistance and growth-promoting properties.
Applicable Scope
- Aquaculture Water Quality Purification
- Animal Feed Application
- Sewage Biological Treatment
- Biological Fertilizer Addition
Usage and Dosage
Aquaculture:
- Sprinkle: Use 1 liter for 1-2 mu per 1 meter of water surface. Dilute in water and spread.
- Mix with Food: Combine 1 liter with 100 kg of feed, wait 30 minutes, then feed.
Planting:
Basal Fertilizer: Use 10 liters per mu for root irrigation and 5 liters for foliar spray on seedlings before topping.
Root Irrigation: Utilize 15 liters per mu for every 7 days during growth period.
Packaging and Storage
- Quantity: 10 liters/item
- Packaging: Plastic barrels
- Conditions: Store in a cool, dry place
- Shelf Life: 12 months
Precautions
- Activated product is more effective; shake well before using.
- Avoid using chemical and disinfectant agents within three days following application.
Delivery Terms
Method | Weight Limit | Timeframe | Cost | Service Description |
---|---|---|---|---|
By Express | Under 50kg | 3-7 days | High | Door to door service |
By Air | Over 50kg | 3-7 days | High | Professional broker needed, port to port service |
By Sea | Over 200kg | 7-45 days | Low | Port to port service, professional broker needed |
By land | Over 500kg | Varies | N/A | Only available if sea transportation is not accessible, by train or motor, cost may vary |
- Lead time 15 working days after purchase order, Port of Loading: Guangzhou / Shanghai Port
- For high value products, it is recommended to select air shipping or DHL express for safety